8-01-07 Pylons for Dock completed.
8-04-07 Lower Terrace completed. ( except for steps from upper terrace) 
8-10-07 Landscaping of upper property completed.
8-17-07  Poured footers and walls for foundation of the house.
8-24-07  Poured concrete for the garage.
8-31-07  Rough road to the lake  completed.
8-31-07  Basement floor completed
 