Began building of deck; deck completed 7/10/08; Steel supports(10) are almost completed. Drywall delivered 7/17/08. 
Siding on the house completed;stairs down to the lower patio completed; installed boat lift.

Deck-West View ( Lakeside)
deck4.JPG

South Deck
deck4.JPG

South Deck
SouthDeck.JPG

The Siding
Siding.JPG

Deck- West View Lakeside
deck4.JPG

Deck-South View
deck4.JPG

Finished Deck
FisnishedDeckJPG.JPG

The Stairs to the Lower Patio
TheStairs2.JPG