Cannioto Cove-August 2008

Home
Cannioto Cove
320 W. Main
Map/Directions
Contact Us

August was a busy month with the house completely drywalled and finished. Site work was done to finish the trench to the well. The road was worked on with excess dirt used on the road down to the lake. You can drive a SUV down to the lake and the dock was almost completed. (80%). On the exterior of the house started to work on the stucco. Poured concrete on the front and side of the house. 

Drywall being delivered
Drywall2.JPG

The Hallway
Hallway.JPG

Kitchen
Kitchen.JPG

Pouring Concrete
Concrete3.JPG

After the pour
Concrete004.JPG

The Dock
Dock1.JPG

View of Lakefront from the Dock
Dock3.JPG

Sunroom Before
SunroomB4.JPG

Drywaller
Drywaller.JPG

Sunroom ready for paint.
Drywall1.JPG

The Boss
TheBoss.JPG

Road down to the Lake
Roaddowntothedock.JPG

The Boat in the boatl lift-No more trailering
boat1.JPG

EFIS
EFIS.JPG