10-17-08 Interior painting completed; outside stucco 90% completed; railings started; marble floors completed Terri's bathroom and Laundry room; granite floors in hallway started; septic tank installed.
10-31-08 Septic system completed. We have indooor plumbing! Exterior of the house is completed. Interior walls have all been painted. Electric lights and fans installed.  Tiled three more bathrooms and worked on entry way tile.  Installed garage door.